4 active projects totaling 1,530 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Feb 2010 to Sep 2031 (8 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1325 | Baker 345 kV | 345 | 1,046 | Gas | Active | Sep 2031 |
| W1-035 | Baker 345kV | 345 | 750 | Gas | Withdrawn | Jun 2012 |
| C01-1131 | Baker 345 kV | 345 | 458 | Gas | Active | Sep 2030 |
| W3-162 | Riverside Generating Stations | 345 | 20 | Gas | In Service | Feb 2010 |
| AB1-149 | Baker 138kV | 138 | 15.8 | Wind | Withdrawn | Dec 2018 |
| AD1-125 | Short Mountain Wind Energy | 138 | 11.8 | Wind | Pending Termination | Dec 2027 |
| Y2-045 | Riverside Generating Station | 345 | 6 | Gas | In Service | Jul 2015 |
| X2-006 | Riverside Generating Station | 345 | 0 | Gas | Withdrawn | Jun 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Baker (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-19 | AD1-125 | Terminal status | 11.8 | Engineering and Procurement → Pending Termination |
Other PJM queue substations in Lawrence County, KY
- Big Sandy 1: 2 active, 25 MW of 2 filed
Other PJM queue substations in Hardy County, WV
- 502 Junction-Meadowbrook: none active of 2 filed
- Mt. Storm - Meadow Brook: none active of 2 filed