Baker substation interconnection queue
5 active projects totalling 1,541.8 MW in the PJM queue, plus 3 with terminal status (shown greyed).
5active projects
1,541.8active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1325 | Baker 345 kV | 345 | 1,046 | Gas | Active |
| W1-035 | Baker 345kV | 345 | 750 | Gas | Withdrawn |
| C01-1131 | Baker 345 kV | 345 | 458 | Gas | Active |
| W3-162 | Riverside Generating Stations | 345 | 20 | Gas | In Service |
| AB1-149 | Baker 138kV | 138 | 15.8 | Wind | Withdrawn |
| AD1-125 | Short Mountain Wind Energy | 138 | 11.8 | Wind | Engineering and Procurement |
| Y2-045 | Riverside Generating Station | 345 | 6 | Gas | In Service |
| X2-006 | Riverside Generating Station | 345 | 0 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.