Baker 345 kV
PJM queue ID C01-1325
Baker 345 kV (C01-1325) is listed in the PJM interconnection queue as a 1,046 MW gas project in Lawrence County, KY. The filing names Baker as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2031.
| Queue ID | C01-1325 |
|---|---|
| Project name | Baker 345 kV |
| Status (as published) | Active |
| Substation | Baker |
| Point of interconnection | Baker 345 kV |
| County | Lawrence |
| State | KY |
| Voltage | 345 kV |
| Capacity | 1,046 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2031-09-30 |
| Source dataset | cycle |
Same substation and county
Baker substation: 8 requests in the PJM queue, 4 active totaling 1,530 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1131 | Baker 345 kV | 458 | Gas | Active |
| W3-162 | Riverside Generating Stations | 20 | Gas | In Service |
| Y2-045 | Riverside Generating Station | 6 | Gas | In Service |
| W1-035 | Baker 345kV | 750 | Gas | Withdrawn |
| AB1-149 | Baker 138kV | 15.8 | Wind | Withdrawn |
| AD1-125 | Short Mountain Wind Energy | 11.8 | Wind | Pending Termination |
| X2-006 | Riverside Generating Station | 0 | Gas | Withdrawn |
Lawrence, KY: 11 requests in the PJM queue, 7 active totaling 1,575 MW.
A substation with the same name is named in PJM transmission planning materials: Baker (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Appalachian Power Company |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 1046.0 |
| MW capacity | 1046.0 |
| MFO | 1046.0 |
| Submitted date | 4/24/2026 |
| Last updated | 7/7/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.