Hardy, WV interconnection queue

2 active projects totalling 176.8 MW in the PJM queue, plus 9 with terminal status (shown greyed).

2active projects
176.8active MW
11total filed
Queue IDProjectkVMWResourceStatus
V3-022 502 Junction-Meadowbrook 500kV 500 500 Not reported Withdrawn
AI2-188 Mt. Storm - Meadow Brook 500 kV 500 246.3 Hybrid Withdrawn
C01-1287 Hardy - Junction 138 kV 138 165 Hybrid Active
AI2-189 Mt. Storm - Meadow Brook 500 kV 500 66.3 Solar Withdrawn
AG2-403 Meadow Brook - Mt. Storm 500 kV 500 52.5 Solar Withdrawn
AG2-404 Meadow Brook - Mt. Storm 500 kV II 500 52.5 Solar Withdrawn
AI2-155 Baker 138 kV II 138 29.8 Wind Withdrawn
AB1-149 Baker 138kV 138 15.8 Wind Withdrawn
R21 Short Mountain n/r 14 Wind Withdrawn
AD1-125 Short Mountain Wind Energy 138 11.8 Wind Engineering and Procurement
Y1-016 Baker-Hardy 138kV 138 6.5 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.