Hardy, WV interconnection queue
2 active projects totalling 176.8 MW in the PJM queue, plus 9 with terminal status (shown greyed).
2active projects
176.8active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| V3-022 | 502 Junction-Meadowbrook 500kV | 500 | 500 | Not reported | Withdrawn |
| AI2-188 | Mt. Storm - Meadow Brook 500 kV | 500 | 246.3 | Hybrid | Withdrawn |
| C01-1287 | Hardy - Junction 138 kV | 138 | 165 | Hybrid | Active |
| AI2-189 | Mt. Storm - Meadow Brook 500 kV | 500 | 66.3 | Solar | Withdrawn |
| AG2-403 | Meadow Brook - Mt. Storm 500 kV | 500 | 52.5 | Solar | Withdrawn |
| AG2-404 | Meadow Brook - Mt. Storm 500 kV II | 500 | 52.5 | Solar | Withdrawn |
| AI2-155 | Baker 138 kV II | 138 | 29.8 | Wind | Withdrawn |
| AB1-149 | Baker 138kV | 138 | 15.8 | Wind | Withdrawn |
| R21 | Short Mountain | n/r | 14 | Wind | Withdrawn |
| AD1-125 | Short Mountain Wind Energy | 138 | 11.8 | Wind | Engineering and Procurement |
| Y1-016 | Baker-Hardy 138kV | 138 | 6.5 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.