Lawrence, KY interconnection queue

7 active projects totalling 1,575 MW in the PJM queue, plus 4 with terminal status (shown greyed).

7active projects
1,575active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-1325 Baker 345 kV 345 1,046 Gas Active
W1-035 Baker 345kV 345 750 Gas Withdrawn
C01-1131 Baker 345 kV 345 458 Gas Active
C01-1747 Big Sandy - Inez 138 kV 138 150 Hybrid Withdrawn
AH2-249 Busseyville 138 kV 138 90 Solar Withdrawn
R62 Big Sandy #1 138 20 Gas In Service
W3-162 Riverside Generating Stations 345 20 Gas In Service
AC1-038 Big Sandy #1 138 13 Gas In Service
AC2-172 Big Sandy #1 138 12 Gas In Service
Y2-045 Riverside Generating Station 345 6 Gas In Service
X2-006 Riverside Generating Station 345 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.