Lawrence, KY interconnection queue
7 active projects totalling 1,575 MW in the PJM queue, plus 4 with terminal status (shown greyed).
7active projects
1,575active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1325 | Baker 345 kV | 345 | 1,046 | Gas | Active |
| W1-035 | Baker 345kV | 345 | 750 | Gas | Withdrawn |
| C01-1131 | Baker 345 kV | 345 | 458 | Gas | Active |
| C01-1747 | Big Sandy - Inez 138 kV | 138 | 150 | Hybrid | Withdrawn |
| AH2-249 | Busseyville 138 kV | 138 | 90 | Solar | Withdrawn |
| R62 | Big Sandy #1 | 138 | 20 | Gas | In Service |
| W3-162 | Riverside Generating Stations | 345 | 20 | Gas | In Service |
| AC1-038 | Big Sandy #1 | 138 | 13 | Gas | In Service |
| AC2-172 | Big Sandy #1 | 138 | 12 | Gas | In Service |
| Y2-045 | Riverside Generating Station | 345 | 6 | Gas | In Service |
| X2-006 | Riverside Generating Station | 345 | 0 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.