502 Junction-Meadowbrook substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name 502 Junction-Meadowbrook as the point of interconnection, all in WV.
Target commercial operation dates as filed run from Dec 2012 to Dec 2013 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| V3-022 | 502 Junction-Meadowbrook 500kV | 500 | 500 | Not reported | Withdrawn | Dec 2012 |
| W1-027 | 502 Junction-Meadowbrook 500kV | 500 | 500 | Not reported | Withdrawn | Dec 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hardy County, WV
- Baker: 4 active, 1,530 MW of 8 filed
- Mt. Storm - Meadow Brook: none active of 2 filed