Riverside Generating Station
PJM queue ID Y2-045
Riverside Generating Station (Y2-045) is listed in the PJM interconnection queue as a 6 MW gas project in Lawrence County, KY. The filing names Baker as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 8, 2015.
| Queue ID | Y2-045 |
|---|---|
| Project name | Riverside Generating Station |
| Status (as published) | In Service |
| Substation | Baker |
| Point of interconnection | Baker 345kV |
| County | Lawrence |
| State | KY |
| Voltage | 345 kV |
| Capacity | 6 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2015-07-08 |
| Source dataset | serial |
Same substation and county
Baker substation: 8 requests in the PJM queue, 4 active totaling 1,530 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1325 | Baker 345 kV | 1,046 | Gas | Active |
| C01-1131 | Baker 345 kV | 458 | Gas | Active |
| W3-162 | Riverside Generating Stations | 20 | Gas | In Service |
| W1-035 | Baker 345kV | 750 | Gas | Withdrawn |
| AB1-149 | Baker 138kV | 15.8 | Wind | Withdrawn |
| AD1-125 | Short Mountain Wind Energy | 11.8 | Wind | Pending Termination |
| X2-006 | Riverside Generating Station | 0 | Gas | Withdrawn |
Lawrence, KY: 11 requests in the PJM queue, 7 active totaling 1,575 MW.
A substation with the same name is named in PJM transmission planning materials: Baker (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 6 |
| MW capacity | 6 |
| MFO | 999 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.