Mt. Storm - Meadow Brook substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-188 Mt. Storm - Meadow Brook 500 kV 500 246.3 Hybrid Withdrawn
AI2-189 Mt. Storm - Meadow Brook 500 kV 500 66.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.