King George Renewable Energy Facility

PJM queue ID T78

King George Renewable Energy Facility (T78) is listed in the PJM interconnection queue as a 8.5 MW gas project in King George County, VA. The filing names Arnolds Corner as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 4, 2010.

Queue IDT78
Project nameKing George Renewable Energy Facility
Status (as published)In Service
SubstationArnolds Corner
Point of interconnectionArnolds Corner 34.5kV
CountyKing George
StateVA
Voltage34.5 kV
Capacity8.5 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2010-05-04
Source datasetserial

Same substation and county

Arnolds Corner substation: 2 requests in the PJM queue, 1 active totaling 8.5 MW.

Queue IDProjectMWResourceStatus
AG2-020Arnolds Corner Energy Storage2.8BatteryWithdrawn

King George, VA: 17 requests in the PJM queue, 6 active totaling 328 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9.8
MW capacity8.5
MFO9.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.