Harwood Power
PJM queue ID AF2-013
Harwood Power (AF2-013) is listed in the PJM interconnection queue as a 100 MW battery project in King George County, VA. The filing names Arnold's Corner-Dahlgren as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of October 1, 2029.
| Queue ID | AF2-013 |
|---|---|
| Project name | Harwood Power |
| Status (as published) | Engineering and Procurement |
| Substation | Arnold's Corner-Dahlgren |
| Point of interconnection | Arnold's Corner-Dahlgren 230 kV |
| County | King George |
| State | VA |
| Voltage | 230 kV |
| Capacity | 100 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-10-01 |
| Source dataset | serial |
Same substation and county
Arnold's Corner-Dahlgren substation: 2 requests in the PJM queue, 1 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-019 | Arnold's Corner-Dahlgren 230 kV | 100 | Battery | Withdrawn |
King George, VA: 17 requests in the PJM queue, 6 active totaling 328 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 100 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.