Harwood Power (AF2-013) is listed in the PJM interconnection queue as a 100 MW battery project in King George County, VA. The filing names Arnold's Corner-Dahlgren as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of October 1, 2029.

Queue IDAF2-013
Project nameHarwood Power
Status (as published)Engineering and Procurement
SubstationArnold's Corner-Dahlgren
Point of interconnectionArnold's Corner-Dahlgren 230 kV
CountyKing George
StateVA
Voltage230 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-01
Source datasetserial

Same substation and county

Arnold's Corner-Dahlgren substation: 2 requests in the PJM queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
AG1-019Arnold's Corner-Dahlgren 230 kV100BatteryWithdrawn

King George, VA: 17 requests in the PJM queue, 6 active totaling 328 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity100
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first