Lackawanna Thermal Generating Station

PJM queue ID Y2-089

Lackawanna Thermal Generating Station (Y2-089) is listed in the PJM interconnection queue as a 370 MW gas project in Lackawanna County, PA. The filing names Lackawanna as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 1, 2019.

Queue IDY2-089
Project nameLackawanna Thermal Generating Station
Status (as published)In Service
SubstationLackawanna
Point of interconnectionLackawanna 230kV
CountyLackawanna
StatePA
Voltage230 kV
Capacity370 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2019-04-01
Source datasetserial

Same substation and county

Lackawanna substation: 7 requests in the PJM queue, 4 active totaling 1,436 MW.

Queue IDProjectMWResourceStatus
X4-048Lackawanna Thermal Generating Station1,000GasIn Service
AA1-077Lackawanna Thermal Generating Station34GasIn Service
C01-1170Lackawanna 230 kV32GasActive
B45Lackawanna 230kV555GasWithdrawn
AB1-108Lackawanna 500 kV485GasWithdrawn
AH1-697Lackawanna 230kV78.6GasWithdrawn

Lackawanna, PA: 25 requests in the PJM queue, 10 active totaling 3,660.4 MW.

A substation with the same name is named in PJM transmission planning materials: Lackawanna (PPL, 20 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy370
MW capacity370
MFO1370

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.