Substation Scout

Lackawanna Thermal Generating Station

PJM queue ID X4-048

Lackawanna Thermal Generating Station (X4-048) is listed in the PJM interconnection queue as a 1,000 MW gas project in Lackawanna County, PA. The filing names Lackawanna as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.

Queue IDX4-048
Project nameLackawanna Thermal Generating Station
Status (as published)In Service
SubstationLackawanna
Point of interconnectionLackawanna 230kV
CountyLackawanna
StatePA
Voltage230 kV
Capacity1,000 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2018-12-31
Source datasetserial

Same substation and county

Lackawanna substation: 7 requests in the PJM queue, 4 active totaling 1,436 MW.

Queue IDProjectMWResourceStatus
Y2-089Lackawanna Thermal Generating Station370GasIn Service
AA1-077Lackawanna Thermal Generating Station34GasIn Service
C01-1170Lackawanna 230 kV32GasActive
B45Lackawanna 230kV555GasWithdrawn
AB1-108Lackawanna 500 kV485GasWithdrawn
AH1-697Lackawanna 230kV78.6GasWithdrawn

Lackawanna, PA: 25 requests in the PJM queue, 10 active totaling 3,660.4 MW.

A substation with the same name is named in PJM transmission planning materials: Lackawanna (PPL, 20 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1000
MW capacity1000
MFO1000

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.