Substation Scout

Lackawanna 230 kV

PJM queue ID C01-1170

Lackawanna 230 kV (C01-1170) is listed in the PJM interconnection queue as a 32 MW gas project in Lackawanna County, PA. The filing names Lackawanna as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2029.

Queue IDC01-1170
Project nameLackawanna 230 kV
Status (as published)Active
SubstationLackawanna
Point of interconnectionLackawanna 230 kV
CountyLackawanna
StatePA
Voltage230 kV
Capacity32 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2029-12-31
Source datasetcycle

Same substation and county

Lackawanna substation: 7 requests in the PJM queue, 4 active totaling 1,436 MW.

Queue IDProjectMWResourceStatus
X4-048Lackawanna Thermal Generating Station1,000GasIn Service
Y2-089Lackawanna Thermal Generating Station370GasIn Service
AA1-077Lackawanna Thermal Generating Station34GasIn Service
B45Lackawanna 230kV555GasWithdrawn
AB1-108Lackawanna 500 kV485GasWithdrawn
AH1-697Lackawanna 230kV78.6GasWithdrawn

Lackawanna, PA: 25 requests in the PJM queue, 10 active totaling 3,660.4 MW.

A substation with the same name is named in PJM transmission planning materials: Lackawanna (PPL, 20 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLackawanna Energy Center LLC
Transmission ownerPPL
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity32.0
MFO1483.0
Submitted date4/24/2026
Last updated6/12/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.