Substation Scout

Four Rivers 230 kV

PJM queue ID C01-1795

Four Rivers 230 kV (C01-1795) is listed in the PJM interconnection queue as a 8 MW gas project in hanover County, VA. The filing names Four Rivers as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.

Queue IDC01-1795
Project nameFour Rivers 230 kV
Status (as published)Active
SubstationFour Rivers
Point of interconnectionFour Rivers 230 kV
Countyhanover
StateVA
Voltage230 kV
Capacity8 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2029-06-01
Source datasetcycle

Same substation and county

Four Rivers substation: 12 requests in the PJM queue, 8 active totaling 920.9 MW.

Queue IDProjectMWResourceStatus
C01-1760Four Rivers 230 kV449.6GasActive
AA1-145Doswell SC Units 2 & 3340GasIn Service
AC1-134Doswell Facility (Doswell Complex 5 & 6)50GasIn Service
AA1-083Doswell Facility20GasIn Service
AB2-050Doswell Complex 5 & 620GasIn Service
AH1-679Four Rivers 230 kV20GasActive
Y1-066Four Rivers NUG CC-113.3GasIn Service
T168Four Rivers 500kV1,010GasWithdrawn
AH1-558Doswell Limited Partnership250BatteryWithdrawn
T167Four Rivers NUG CC120GasWithdrawn
Y1-048Four Rivers NUG CC-120GasWithdrawn

hanover, VA: 1 request in the PJM queue, 1 active totaling 8 MW.

A substation with the same name is named in PJM transmission planning materials: Four Rivers (DOM, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperDoswell, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy8.0
MW capacity8.0
MFO774.0
Submitted date4/23/2026
Last updated7/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first