Doswell SC Units 2 & 3
PJM queue ID AA1-145
Doswell SC Units 2 & 3 (AA1-145) is listed in the PJM interconnection queue as a 340 MW gas project in Hanover County, VA. The filing names Four Rivers as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 1, 2018.
| Queue ID | AA1-145 |
|---|---|
| Project name | Doswell SC Units 2 & 3 |
| Status (as published) | In Service |
| Substation | Four Rivers |
| Point of interconnection | Four Rivers 230kV |
| County | Hanover |
| State | VA |
| Voltage | 230 kV |
| Capacity | 340 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2018-07-01 |
| Source dataset | serial |
Same substation and county
Four Rivers substation: 12 requests in the PJM queue, 8 active totaling 920.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1760 | Four Rivers 230 kV | 449.6 | Gas | Active |
| AC1-134 | Doswell Facility (Doswell Complex 5 & 6) | 50 | Gas | In Service |
| AA1-083 | Doswell Facility | 20 | Gas | In Service |
| AB2-050 | Doswell Complex 5 & 6 | 20 | Gas | In Service |
| AH1-679 | Four Rivers 230 kV | 20 | Gas | Active |
| Y1-066 | Four Rivers NUG CC-1 | 13.3 | Gas | In Service |
| C01-1795 | Four Rivers 230 kV | 8 | Gas | Active |
| T168 | Four Rivers 500kV | 1,010 | Gas | Withdrawn |
| AH1-558 | Doswell Limited Partnership | 250 | Battery | Withdrawn |
| T167 | Four Rivers NUG CC | 120 | Gas | Withdrawn |
| Y1-048 | Four Rivers NUG CC-1 | 20 | Gas | Withdrawn |
Hanover, VA: 30 requests in the PJM queue, 9 active totaling 930.4 MW.
A substation with the same name is named in PJM transmission planning materials: Four Rivers (DOM, 11 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 340 |
| MW capacity | 340 |
| MFO | 340 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.