Doswell Complex 5 & 6

PJM queue ID AB2-050

Doswell Complex 5 & 6 (AB2-050) is listed in the PJM interconnection queue as a 20 MW gas project in Hanover County, VA. The filing names Four Rivers as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2020.

Queue IDAB2-050
Project nameDoswell Complex 5 & 6
Status (as published)In Service
SubstationFour Rivers
Point of interconnectionFour Rivers 230kV
CountyHanover
StateVA
Voltage230 kV
Capacity20 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2020-03-01
Source datasetserial

Same substation and county

Four Rivers substation: 12 requests in the PJM queue, 8 active totaling 920.9 MW.

Queue IDProjectMWResourceStatus
C01-1760Four Rivers 230 kV449.6GasActive
AA1-145Doswell SC Units 2 & 3340GasIn Service
AC1-134Doswell Facility (Doswell Complex 5 & 6)50GasIn Service
AA1-083Doswell Facility20GasIn Service
AH1-679Four Rivers 230 kV20GasActive
Y1-066Four Rivers NUG CC-113.3GasIn Service
C01-1795Four Rivers 230 kV8GasActive
T168Four Rivers 500kV1,010GasWithdrawn
AH1-558Doswell Limited Partnership250BatteryWithdrawn
T167Four Rivers NUG CC120GasWithdrawn
Y1-048Four Rivers NUG CC-120GasWithdrawn

Hanover, VA: 30 requests in the PJM queue, 9 active totaling 930.4 MW.

A substation with the same name is named in PJM transmission planning materials: Four Rivers (DOM, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity20
MFO746

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.