Princeton University Generating Facility
PJM queue ID AF2-168
Princeton University Generating Facility (AF2-168) is listed in the PJM interconnection queue as a hybrid request filed at 0 MW (a net change or energy-only filing) in Mercer County, NJ. The filing names Princeton University as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 27, 2023.
| Queue ID | AF2-168 |
|---|---|
| Project name | Princeton University Generating Facility |
| Status (as published) | In Service |
| Substation | Princeton University |
| Point of interconnection | Princeton University 69 kV |
| County | Mercer |
| State | NJ |
| Voltage | 69 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Natural Gas; Solar; Other |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2023-04-27 |
| Source dataset | serial |
Same substation and county
Princeton University substation: 2 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1887 | Princeton University 69 kV | 0 | Battery | Withdrawn |
Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5 |
| MW capacity | 0 |
| MFO | 5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.