Pennington 13 kV Solar
PJM queue ID AC2-009
Pennington 13 kV Solar (AC2-009) is listed in the PJM interconnection queue as a 0.1 MW hybrid project in Mercer County, NJ. The filing names Pennington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 2, 2018.
| Queue ID | AC2-009 |
|---|---|
| Project name | Pennington 13 kV Solar |
| Status (as published) | In Service |
| Substation | Pennington |
| Point of interconnection | Pennington 13 kV |
| County | Mercer |
| State | NJ |
| Voltage | 13 kV |
| Capacity | 0.1 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2018-03-02 |
| Source dataset | serial |
Same substation and county
Mercer, NJ: 28 requests in the PJM queue, 8 active totaling 183.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0.59 |
| MW capacity | 0.1 |
| MFO | 0.59 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.