Proteus Vernon Solar SLF

ERCOT queue ID 25INR0377

Proteus Vernon Solar SLF (25INR0377) is listed in the ERCOT interconnection queue as a 75 MW solar project in Wilbarger County, TX. The filing names Vernon as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of February 18, 2029. It records the screening study as complete on June 19, 2023.

Queue ID25INR0377
Project nameProteus Vernon Solar SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationVernon
Point of interconnection6060 Vernon 138kV
CountyWilbarger
StateTX
Voltage138 kV
Capacity75 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-02-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Vernon substation: 2 requests in the ERCOT queue, 2 active totaling 75 MW.

Queue IDProjectMWResourceStatus
25INR0416Proteus Vernon Storage SLF0BatterySS Completed, FIS Started, No IA

Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityVernon Solar and Storage LLC (a Delaware LLC)
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-06-19
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.