Felix Storage
ERCOT queue ID 27INR0009
Felix Storage (27INR0009) is listed in the ERCOT interconnection queue as a 100.5 MW battery project in Wilbarger County, TX. The filing names The Riley Substation (#); AEP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 31, 2027. It records the screening study as complete on March 30, 2023.
| Queue ID | 27INR0009 |
|---|---|
| Project name | Felix Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | The Riley Substation (#); AEP |
| Point of interconnection | The 345 kV Riley Substation (#6101); AEP |
| County | Wilbarger |
| State | TX |
| Voltage | 345 kV |
| Capacity | 100.5 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-07-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
The Riley Substation (#); AEP substation: 2 requests in the ERCOT queue, 2 active totaling 285.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 27INR0007 | Felix East Solar | 184.6 | Solar | SS Completed, FIS Started, IA |
Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Felix 1, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2023-03-30 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.