Tap Valley South – Paris Switch substation interconnection queue

2 active projects totalling 182.2 MW in the ERCOT queue.

2active projects
182.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
22INR0314 Lan Solar SLF 345 182.2 Solar SS Completed, FIS Started, No IA
24INR0262 Lan Battery SLF 345 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.