Tap PARIS_SW1_5 -- WOODARD_5 substation interconnection queue
2 active projects totaling 320.8 MW in the ERCOT queue.
2 ERCOT queue filings name Tap PARIS_SW1_5 -- WOODARD_5 as the point of interconnection, all in Lamar County, TX.
Target commercial operation date as filed: Jul 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Star Dairy Storage (1 filing), Star Dairy Solar LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 25INR0334 | Star Dairy Storage | 345 | 205.2 | Battery | SS Completed, FIS Completed, IA | Jul 2027 |
| 25INR0164 | Star Dairy Solar | 345 | 115.6 | Solar | SS Completed, FIS Completed, IA | Jul 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | 25INR0334 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
| 2026-10-05 | 25INR0164 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Other ERCOT queue substations in Lamar County, TX
- tap both FarmersVl - Moses ckts: 3 active, 800 MW of 3 filed
- TTRSW: 2 active, 520.6 MW of 2 filed
- Tap Toco Switch (#) – Paris Switch (#): 2 active, 223.1 MW of 2 filed
- Tap Bois Pump - Brookston: 2 active, 218.8 MW of 2 filed
- Tap Valley South – Paris Switch: 2 active, 182.2 MW of 2 filed