Tap Bois Pump - Brookston substation interconnection queue
2 active projects totaling 218.8 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Bois Pump - Brookston as the point of interconnection, all in Lamar County, TX.
Target commercial operation date as filed: Jul 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Roxton Solar, LLC (2 filings).
2active projects
218.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0470 | Roxton Solar | 138 | 116.8 | Solar | SS Completed, FIS Completed, IA | Jul 2028 |
| 26INR0469 | Roxton Storage | 138 | 102 | Battery | SS Completed, FIS Completed, IA | Jul 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
2 changes to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | 26INR0470 | Status change | n/a | SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA |
| 2026-10-05 | 26INR0469 | Status change | n/a | SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA |
Other ERCOT queue substations in Lamar County, TX
- tap both FarmersVl - Moses ckts: 3 active, 800 MW of 3 filed
- TTRSW: 2 active, 520.6 MW of 2 filed
- Tap PARIS_SW1_5 -- WOODARD_5: 2 active, 320.8 MW of 2 filed
- Tap Toco Switch (#) – Paris Switch (#): 2 active, 223.1 MW of 2 filed
- Tap Valley South – Paris Switch: 2 active, 182.2 MW of 2 filed