Lan Solar SLF

ERCOT queue ID 22INR0314

Lan Solar SLF (22INR0314) is listed in the ERCOT interconnection queue as a 182.2 MW solar project in Lamar County, TX. The filing names Tap Valley South – Paris Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of August 26, 2028. It records the screening study as complete on July 7, 2020.

Queue ID22INR0314
Project nameLan Solar SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Valley South – Paris Switch
Point of interconnectionTap 345kV 1729 Valley South – 1692 Paris Switch
CountyLamar
StateTX
Voltage345 kV
Capacity182.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-08-26
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Valley South – Paris Switch substation: 2 requests in the ERCOT queue, 2 active totaling 182.2 MW.

Queue IDProjectMWResourceStatus
24INR0262Lan Battery SLF0BatterySS Completed, FIS Started, No IA

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBR Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2020-07-07
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.