Substation Scout

Tap Toco Switch (#) – Paris Switch (#) substation interconnection queue

2 active projects totaling 223.1 MW in the ERCOT queue.

2 ERCOT queue filings name Tap Toco Switch (#) – Paris Switch (#) as the point of interconnection, all in Lamar County, TX.

Target commercial operation date as filed: Oct 2026 (2 filings).

Interconnecting entity as filed: MRG GOODY SOLAR PROJECT, LLC (1 filing), MRG Goody Solar Project LLC (1 filing).

2active projects
223.1active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
23INR0225 MRG GOODY SOLAR 138 170.8 Solar SS Completed, FIS Completed, IA Oct 2026
24INR0305 MRG Goody Storage 138 52.3 Battery SS Completed, FIS Completed, IA Oct 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Lamar County, TX

All 28 ERCOT queue filings in Lamar County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first