MRG GOODY SOLAR
ERCOT queue ID 23INR0225
MRG GOODY SOLAR (23INR0225) is listed in the ERCOT interconnection queue as a 170.8 MW solar project in Lamar County, TX. The filing names Tap Toco Switch (#) – Paris Switch (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 28, 2026. It records the screening study as complete on June 11, 2021, the full interconnection study as approved on June 17, 2025 and the interconnection agreement as signed on November 7, 2023.
| Queue ID | 23INR0225 |
|---|---|
| Project name | MRG GOODY SOLAR |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Toco Switch (#) – Paris Switch (#) |
| Point of interconnection | Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693) |
| County | Lamar |
| State | TX |
| Voltage | 138 kV |
| Capacity | 170.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-10-28 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Toco Switch (#) – Paris Switch (#) substation: 2 requests in the ERCOT queue, 2 active totaling 223.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 24INR0305 | MRG Goody Storage | 52.3 | Battery | SS Completed, FIS Completed, IA |
Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | MRG GOODY SOLAR PROJECT, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-11-07 |
| Screening study complete | 2021-06-11 |
| Full interconnection study approved | 2025-06-17 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.