Substation Scout

MRG GOODY SOLAR

ERCOT queue ID 23INR0225

MRG GOODY SOLAR (23INR0225) is listed in the ERCOT interconnection queue as a 170.8 MW solar project in Lamar County, TX. The filing names Tap Toco Switch (#) – Paris Switch (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 28, 2026. It records the screening study as complete on June 11, 2021, the full interconnection study as approved on June 17, 2025 and the interconnection agreement as signed on November 7, 2023.

Queue ID23INR0225
Project nameMRG GOODY SOLAR
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Toco Switch (#) – Paris Switch (#)
Point of interconnectionTap 138 kV Toco Switch (#1700) – Paris Switch (#1693)
CountyLamar
StateTX
Voltage138 kV
Capacity170.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-10-28
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Toco Switch (#) – Paris Switch (#) substation: 2 requests in the ERCOT queue, 2 active totaling 223.1 MW.

Queue IDProjectMWResourceStatus
24INR0305MRG Goody Storage52.3BatterySS Completed, FIS Completed, IA

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMRG GOODY SOLAR PROJECT, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2023-11-07
Screening study complete2021-06-11
Full interconnection study approved2025-06-17
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first