White Wing Storage

ERCOT queue ID 27INR0333

White Wing Storage (27INR0333) is listed in the ERCOT interconnection queue as a 130.4 MW battery project in Wilbarger County, TX. The filing names Tap (#) Tesla - (#) Riley as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on October 13, 2025.

Queue ID27INR0333
Project nameWhite Wing Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap (#) Tesla - (#) Riley
Point of interconnectionTap 345 kV (#60504) Tesla - (#6111) Riley
CountyWilbarger
StateTX
Voltage345 kV
Capacity130.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap (#) Tesla - (#) Riley substation: 2 requests in the ERCOT queue, 2 active totaling 257.8 MW.

Queue IDProjectMWResourceStatus
27INR0332White Wing Solar127.4SolarSS Completed, FIS Started, No IA

Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityWhite Wing Solar, LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2025-10-13
Air permitNot Required
Water availability2026-01-12

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.