Substation Scout

Roxton Storage

ERCOT queue ID 26INR0469

Roxton Storage (26INR0469) is listed in the ERCOT interconnection queue as a 102 MW battery project in Lamar County, TX. The filing names Tap Bois Pump - Brookston as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 21, 2028. It records the screening study as complete on February 3, 2025, the full interconnection study as approved on March 10, 2026 and the interconnection agreement as signed on September 3, 2026.

Queue ID26INR0469
Project nameRoxton Storage
Status (as published)SS Completed, FIS Completed, IA
SubstationTap Bois Pump - Brookston
Point of interconnectionTap 138 KV Bois Pump (1835) - Brookston (1833)
CountyLamar
StateTX
Voltage138 kV
Capacity102 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-07-21
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Bois Pump - Brookston substation: 2 requests in the ERCOT queue, 2 active totaling 218.8 MW.

Queue IDProjectMWResourceStatus
26INR0470Roxton Solar116.8SolarSS Completed, FIS Completed, IA

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Completed, No IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityRoxton Solar, LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2026-09-03
Screening study complete2025-02-03
Full interconnection study approved2026-03-10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.