Substation Scout

Midfield BESS Project SLF

ERCOT queue ID 26INR0362

Midfield BESS Project SLF (26INR0362) is listed in the ERCOT interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Matagorda County, TX. The filing names Tap Blessing - Lolita as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on July 22, 2024.

Queue ID26INR0362
Project nameMidfield BESS Project SLF
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Blessing - Lolita
Point of interconnectionTap 138kV 8121 Blessing - 8125 Lolita
CountyMatagorda
StateTX
Voltage138 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Blessing - Lolita substation: 2 requests in the ERCOT queue, 2 active totaling 150 MW.

Queue IDProjectMWResourceStatus
26INR0347Midfield PV Project SLF150SolarSS Completed, FIS Started, No IA

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHQC Solar Holdings 1, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2024-07-22

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner