SanPat Solar I
ERCOT queue ID 25INR0081
SanPat Solar I (25INR0081) is listed in the ERCOT interconnection queue as a 308.9 MW solar project in San Patricio County, TX. The filing names Tap Angstrom – Naismith as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 8, 2027. It records the screening study as complete on October 12, 2022, the full interconnection study as approved on July 9, 2026 and the interconnection agreement as signed on October 18, 2023.
| Queue ID | 25INR0081 |
|---|---|
| Project name | SanPat Solar I |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Angstrom – Naismith |
| Point of interconnection | Tap 345kV 8249 Angstrom – 8659 Naismith |
| County | San Patricio |
| State | TX |
| Voltage | 345 kV |
| Capacity | 308.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-07-08 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Angstrom – Naismith substation: 2 requests in the ERCOT queue, 2 active totaling 565.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 25INR0052 | SanPat Solar II | 256.2 | Solar | SS Completed, FIS Completed, IA |
San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Padre Solar LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-10-18 |
| Screening study complete | 2022-10-12 |
| Full interconnection study approved | 2026-07-09 |
| Water availability | Not Required |