Reata substation interconnection queue

3 active projects totalling 420.2 MW in the ERCOT queue.

3active projects
420.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
22INR0262 Sequoia II Solar 345 417.5 Solar SS Completed, FIS Completed, IA
26INR0726 Roadrunner Crossing Wind (Uprate) 345 2.7 Wind SS Completed, FIS Completed, No IA
23INR0538 Roadrunner Crossing BESS SLF 354 0 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.