Substation Scout

Rising Star substation interconnection queue

2 active projects totalling 457.5 MW in the ERCOT queue.

2active projects
457.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0274 Richardson McClung Ranch Solar 138 252 Solar SS Completed, FIS Started, No IA
29INR0275 Richardson McClung Ranch BESS 138 205.5 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.