Sequoia II Solar
ERCOT queue ID 22INR0262
| Queue ID | 22INR0262 |
|---|---|
| Project name | Sequoia II Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Reata |
| Point of interconnection | 68051 Reata 345kV |
| County | Callahan |
| State | TX |
| Voltage | 345 kV |
| Capacity | 417.5 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2026-11-21 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | ENBRIDGE SOLAR SEQUOIA II LLC |
|---|---|
| Cdr Zone | WEST |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45167 |
| Screening Study Complete | 43929 |
| Fis Approved | 46097 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.