Palmito substation interconnection queue

3 active projects totalling 603 MW in the ERCOT queue.

3active projects
603active MW
3total filed
Queue IDProjectkVMWResourceStatus
28INR0427 Ouroboros Grid BESS 4 345 201.1 Battery SS Completed, FIS Started, No IA
28INR0428 Ouroboros Grid BESS 5 345 201 Battery SS Completed, FIS Started, No IA
28INR0429 Ouroboros Grid BESS 6 345 200.9 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.