RIOHONDO7A Substation substation interconnection queue
3 active projects totaling 2,971.8 MW in the ERCOT queue.
3 ERCOT queue filings name RIOHONDO7A Substation as the point of interconnection, all in Cameron County, TX.
3active projects
2,971.8active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 29INR0410 | Rattler Combined Cycle Energy Center I | 345 | 990.6 | Gas | SS Started, FIS Started, No IA |
| 29INR0415 | Rattler Combined Cycle Energy Center II | 345 | 990.6 | Gas | SS Started, FIS Started, No IA |
| 29INR0416 | Rattler Combined Cycle Energy Center III | 345 | 990.6 | Gas | SS Started, FIS Started, No IA |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.