3 active projects totaling 2,971.8 MW in the ERCOT queue.

3 ERCOT queue filings name RIOHONDO7A Substation as the point of interconnection, all in Cameron County, TX.

3active projects
2,971.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
29INR0410 Rattler Combined Cycle Energy Center I 345 990.6 Gas SS Started, FIS Started, No IA
29INR0415 Rattler Combined Cycle Energy Center II 345 990.6 Gas SS Started, FIS Started, No IA
29INR0416 Rattler Combined Cycle Energy Center III 345 990.6 Gas SS Started, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.