Tap Palmito - King Fisher Ckt 1 substation interconnection queue
2 active projects totaling 427.6 MW in the ERCOT queue.
2 ERCOT queue filings name Tap Palmito - King Fisher Ckt 1 as the point of interconnection, all in Cameron County, TX.
Target commercial operation dates as filed run from Dec 2026 to Dec 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: PUERTO DEL SOL, LLC (2 filings).
2active projects
427.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0008 | Puerto Del Sol 1 | 345 | 213.8 | Solar | SS Completed, FIS Started, No IA | Dec 2026 |
| 27INR0002 | Puerto Del Sol 2 | 345 | 213.8 | Solar | SS Completed, FIS Started, No IA | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Cameron County, TX
- RIOHONDO7A Substation: 3 active, 2,971.8 MW of 3 filed
- Palmito: 3 active, 603 MW of 3 filed
- Chalybe: 2 active, 401.5 MW of 2 filed