Chalybe substation interconnection queue
2 active projects totaling 401.5 MW in the ERCOT queue.
2 ERCOT queue filings name Chalybe as the point of interconnection, all in Cameron County, TX.
Target commercial operation date as filed: Jun 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Ouroboros Grid BESS Unit 2 (1 filing), Ouroboros Grid BESS Unit 3 (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0398 | Ouroboros Grid BESS 2 | 345 | 200.8 | Battery | SS Completed, FIS Started, No IA | Jun 2028 |
| 28INR0403 | Ouroboros Grid BESS 3 | 345 | 200.7 | Battery | SS Completed, FIS Started, No IA | Jun 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Chalybe” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Chalybe: Expansion Tracker, ERCOT planning (Cameron County, TX)
Other ERCOT queue substations in Cameron County, TX
- RIOHONDO7A Substation: 3 active, 2,971.8 MW of 3 filed
- Palmito: 3 active, 603 MW of 3 filed
- Tap Palmito - King Fisher Ckt 1: 2 active, 427.6 MW of 2 filed