Chalybe substation interconnection queue

2 active projects totalling 401.5 MW in the ERCOT queue.

2active projects
401.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0398 Ouroboros Grid BESS 2 345 200.8 Battery SS Completed, FIS Started, No IA
28INR0403 Ouroboros Grid BESS 3 345 200.7 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.