Substation Scout

Sunburst Solar

ERCOT queue ID 28INR0179

Sunburst Solar (28INR0179) is listed in the ERCOT interconnection queue as a 301.6 MW solar project in San Patricio County, TX. The filing names KATOEN (Bus#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 16, 2029. It records the screening study as complete on January 7, 2025.

Queue ID28INR0179
Project nameSunburst Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationKATOEN (Bus#)
Point of interconnectionKATOEN (Bus#8579)
CountySan Patricio
StateTX
VoltageNot reported
Capacity301.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-03-16
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

KATOEN (Bus#) substation: 2 requests in the ERCOT queue, 2 active totaling 557.9 MW.

Queue IDProjectMWResourceStatus
28INR0181Sunburst BESS256.3BatterySS Completed, FIS Started, No IA

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIndigo Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Screening study complete2025-01-07
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first