Sunburst Solar
ERCOT queue ID 28INR0179
Sunburst Solar (28INR0179) is listed in the ERCOT interconnection queue as a 301.6 MW solar project in San Patricio County, TX. The filing names KATOEN (Bus#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 16, 2029. It records the screening study as complete on January 7, 2025.
| Queue ID | 28INR0179 |
|---|---|
| Project name | Sunburst Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | KATOEN (Bus#) |
| Point of interconnection | KATOEN (Bus#8579) |
| County | San Patricio |
| State | TX |
| Voltage | Not reported |
| Capacity | 301.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-03-16 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
KATOEN (Bus#) substation: 2 requests in the ERCOT queue, 2 active totaling 557.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 28INR0181 | Sunburst BESS | 256.3 | Battery | SS Completed, FIS Started, No IA |
San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Indigo Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2025-01-07 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.