Iron Cowboy Solar (28INR0305) is listed in the ERCOT interconnection queue as a 144.6 MW solar project in San Patricio County, TX. The filing names Bus # Haisley 4A as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 10, 2029. It records the screening study as complete on September 2, 2025 and the interconnection agreement as signed on August 10, 2026.

Queue ID28INR0305
Project nameIron Cowboy Solar
Status (as published)SS Completed, FIS Started, IA
SubstationBus # Haisley 4A
Point of interconnectionBus #8920 Haisley 4A 138 kV
CountySan Patricio
StateTX
Voltage138 kV
Capacity144.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-07-10
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bus # Haisley 4A substation: 2 requests in the ERCOT queue, 2 active totaling 207.9 MW.

Queue IDProjectMWResourceStatus
28INR0306Iron Cowboy Storage63.3BatterySS Completed, FIS Started, IA

San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a SS Completed, FIS Started, No IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityVaquero II Solar LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2026-08-10
Screening study complete2025-09-02
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first