Bluff Creek substation interconnection queue
2 active projects totaling 275.5 MW in the ERCOT queue.
2 ERCOT queue filings name Bluff Creek as the point of interconnection, all in TX.
Target commercial operation dates as filed run from Feb 2027 to Mar 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Buffalo Gap Wind Farm 2, LLC (1 filing), Nextera (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0625 | Buffalo Gap 2 Wind Repower | 138 | 231.5 | Wind | SS Completed, FIS Completed, IA | Feb 2027 |
| 17INR0052 | Horse13 CallD repower | 138 | 44 | Wind | SS Completed, FIS Completed, IA | Mar 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Bluff Creek” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Bluff Creek: Expansion Tracker, ERCOT planning (Scurry County, TX)
- Bluff Creek: Expansion Tracker, ERCOT planning (Taylor County, TX)
Other ERCOT queue substations in Nolan County, TX
- Sweetwater East Switch: 2 active, 1,288 MW of 2 filed
- Sweetwater East: 2 active, 1,008.9 MW of 2 filed
- Bitter Creek: 3 active, 192.7 MW of 3 filed
Other ERCOT queue substations in Taylor County, TX
- Bluff Creek (Bus #) to Mulberry Creek (Bus #): 2 active, 998 MW of 2 filed
- Abilene Mulberry Creek 345: 2 active, 991 MW of 2 filed
- Central Bluff Switch: 3 active, 615.1 MW of 3 filed