Bluff Creek substation interconnection queue

2 active projects totalling 275.5 MW in the ERCOT queue.

2active projects
275.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0625 Buffalo Gap 2 Wind Repower 138 231.5 Wind SS Completed, FIS Completed, IA
17INR0052 Horse13 CallD repower 138 44 Wind SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.