Bitter Creek substation interconnection queue
3 active projects totaling 192.7 MW in the ERCOT queue.
3 ERCOT queue filings name Bitter Creek as the point of interconnection, all in Nolan County, TX.
Target commercial operation date as filed: Dec 2026 (3 filings). 3 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Leeward Energy (2 filings), Maryneal Windpower, LLC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 18INR0031 | Maryneal Wind | 345 | 182.4 | Wind | SS Completed, FIS Completed, IA | Dec 2026 |
| 17INR0068 | Sweetwater 2 repower | 345 | 7.3 | Wind | SS Completed, FIS Completed, IA | Dec 2026 |
| 18INR0073 | Sweetwater 1 repower | 345 | 3 | Wind | SS Completed, FIS Completed, IA | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Bitter Creek” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Bitter Creek: Expansion Tracker, ERCOT planning (Nolan County, TX)
Other ERCOT queue substations in Nolan County, TX
- Sweetwater East Switch: 2 active, 1,288 MW of 2 filed
- Sweetwater East: 2 active, 1,008.9 MW of 2 filed
- Bluff Creek: 2 active, 275.5 MW of 2 filed