Substation Scout

Bitter Creek substation interconnection queue

3 active projects totaling 192.7 MW in the ERCOT queue.

3 ERCOT queue filings name Bitter Creek as the point of interconnection, all in Nolan County, TX.

Target commercial operation date as filed: Dec 2026 (3 filings). 3 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Leeward Energy (2 filings), Maryneal Windpower, LLC (1 filing).

3active projects
192.7active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
18INR0031 Maryneal Wind 345 182.4 Wind SS Completed, FIS Completed, IA Dec 2026
17INR0068 Sweetwater 2 repower 345 7.3 Wind SS Completed, FIS Completed, IA Dec 2026
18INR0073 Sweetwater 1 repower 345 3 Wind SS Completed, FIS Completed, IA Dec 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Bitter Creek” in TX. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other ERCOT queue substations in Nolan County, TX

All 18 ERCOT queue filings in Nolan County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first