Sweetwater East Switch substation interconnection queue
2 active projects totaling 1,288 MW in the ERCOT queue.
2 ERCOT queue filings name Sweetwater East Switch as the point of interconnection, all in Nolan County, TX.
Target commercial operation date as filed: Dec 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Trailblazer Infrastructure LLC (2 filings).
2active projects
1,288active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 27INR0575 | Trailblazer Natural Gas Generation Plant | 345 | 1,026 | Gas | SS Completed, FIS Started, No IA | Dec 2027 |
| 27INR0576 | Trailblazer BESS | 345 | 262 | Battery | SS Completed, FIS Started, No IA | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the ERCOT queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-07 | 27INR0575 | Status change | n/a | SS Started, FIS Started, No IA → SS Completed, FIS Started, No IA |
Other ERCOT queue substations in Nolan County, TX
- Sweetwater East: 2 active, 1,008.9 MW of 2 filed
- Bluff Creek: 2 active, 275.5 MW of 2 filed
- Bitter Creek: 3 active, 192.7 MW of 3 filed