Sweetwater East Switch substation interconnection queue

2 active projects totalling 1,288 MW in the ERCOT queue.

2active projects
1,288active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0575 Trailblazer Natural Gas Generation Plant 345 1,026 Gas SS Completed, FIS Started, No IA
27INR0576 Trailblazer BESS 345 262 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.