Abilene Mulberry Creek 345 substation interconnection queue
2 active projects totaling 991 MW in the ERCOT queue.
2 ERCOT queue filings name Abilene Mulberry Creek 345 as the point of interconnection, all in Taylor County, TX.
Target commercial operation date as filed: Mar 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Key City Solar LLC (1 filing), Key City Battery Storage LLC (1 filing).
2active projects
991active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 26INR0701 | Key City Solar SLF | n/r | 989.1 | Solar | SS Completed, FIS Started, No IA | Mar 2029 |
| 26INR0700 | Key City Battery Storage SLF | n/r | 1.9 | Battery | SS Completed, FIS Started, No IA | Mar 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.
Other ERCOT queue substations in Taylor County, TX
- Bluff Creek (Bus #) to Mulberry Creek (Bus #): 2 active, 998 MW of 2 filed
- Central Bluff Switch: 3 active, 615.1 MW of 3 filed
- Bluff Creek: 2 active, 275.5 MW of 2 filed