BRP Pyxis BESS

ERCOT queue ID 23INR0094

BRP Pyxis BESS (23INR0094) is listed in the ERCOT interconnection queue as a 206.9 MW battery project in Ward County, TX. The filing names tap Yucca - Sand Tank Pod as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2028. It records the screening study as complete on December 16, 2020.

Queue ID23INR0094
Project nameBRP Pyxis BESS
Status (as published)SS Completed, FIS Started, No IA
Substationtap Yucca - Sand Tank Pod
Point of interconnectiontap 138kV 1009 Yucca - 11197 Sand Tank Pod
CountyWard
StateTX
Voltage138 kV
Capacity206.9 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Ward, TX: 13 requests in the ERCOT queue, 12 active totaling 3,247.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Pyxis BESS LLC
CDR reporting zoneWEST
Fuel codeOTH
Technology codeBA
Screening study complete2020-12-16

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.