FLIFER Solar I

ERCOT queue ID 24INR0538

FLIFER Solar I (24INR0538) is listed in the ERCOT interconnection queue as a 84 MW solar project in Ward County, TX. The filing names Tap Yucca Drive Switch (bus# ) – Sand Tank (bus# ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 15, 2027. It records the screening study as complete on June 1, 2023.

Queue ID24INR0538
Project nameFLIFER Solar I
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Yucca Drive Switch (bus# ) – Sand Tank (bus# )
Point of interconnectionTap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)
CountyWard
StateTX
Voltage138 kV
Capacity84 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-04-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Ward, TX: 13 requests in the ERCOT queue, 12 active totaling 3,247.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityFLIFER LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Screening study complete2023-06-01
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.