McNary-Badger Canyon line (Nine Canyon Substation) substation interconnection queue

2 active projects totalling 95 MW in the BPA queue.

2active projects
95active MW
2total filed
Queue IDProjectkVMWResourceStatus
G5 Nine Canyon Wind Project 115 63 Wind ENERGIZED
G73-01 Nine Canyon 2 115 32 Wind ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.