Substation Scout

Wautoma substation interconnection queue

1 active project totalling 200 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0683 Not reported 500 200 Wind STUDY
G0732 Not reported 500 200 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.