Substation Scout

Ashe Substation substation interconnection queue

1 active project totalling 220 MW in the BPA queue, plus 4 with terminal status (shown greyed).

1active projects
220active MW
5total filed
Queue IDProjectkVMWResourceStatus
G0926 Not reported n/r 500 Solar WITHDRAWN
G0927 Not reported n/r 500 Solar WITHDRAWN
G0928 Not reported n/r 500 Solar WITHDRAWN
G0930 Not reported n/r 500 Solar WITHDRAWN
G0919 Not reported 500 220 Nuclear STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.