Substation Scout

Big Eddy-Midway/ Hanford-John Day line substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G48-01 Not reported 230 249 Wind WITHDRAWN
G49 Not reported 230 249 Wind WITHDRAWN
G48 Not reported 230 150 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.