Central Ferry Substation substation interconnection queue

6 active projects totalling 1,250 MW in the BPA queue, plus 6 with terminal status (shown greyed).

6active projects
1,250active MW
12total filed
Queue IDProjectkVMWResourceStatus
G0624 Not reported n/r 3,813 Solar WITHDRAWN
G0730 Not reported n/r 1,125 Wind WITHDRAWN
G0603 Not reported n/r 275 Solar WITHDRAWN
G0328 Not reported n/r 252 Wind WITHDRAWN
G0329 Not reported n/r 252 Wind WITHDRAWN
G0284 Lower Snake Phase 1 n/r 250 Wind ENERGIZED
G0285 Lower Snake Phase 1 n/r 250 Wind ENERGIZED
G0286 Tucannon River Wind Farm n/r 250 Wind ENERGIZED
G0294 Not reported n/r 250 Wind IA EXECUTED
G0295 Not reported n/r 250 Wind IA EXECUTED
G0330 Not reported n/r 116 Wind WITHDRAWN
G1086 Not reported n/r 0 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.