Central Ferry Substation substation interconnection queue
6 active projects totalling 1,250 MW in the BPA queue, plus 6 with terminal status (shown greyed).
6active projects
1,250active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0624 | Not reported | n/r | 3,813 | Solar | WITHDRAWN |
| G0730 | Not reported | n/r | 1,125 | Wind | WITHDRAWN |
| G0603 | Not reported | n/r | 275 | Solar | WITHDRAWN |
| G0328 | Not reported | n/r | 252 | Wind | WITHDRAWN |
| G0329 | Not reported | n/r | 252 | Wind | WITHDRAWN |
| G0284 | Lower Snake Phase 1 | n/r | 250 | Wind | ENERGIZED |
| G0285 | Lower Snake Phase 1 | n/r | 250 | Wind | ENERGIZED |
| G0286 | Tucannon River Wind Farm | n/r | 250 | Wind | ENERGIZED |
| G0294 | Not reported | n/r | 250 | Wind | IA EXECUTED |
| G0295 | Not reported | n/r | 250 | Wind | IA EXECUTED |
| G0330 | Not reported | n/r | 116 | Wind | WITHDRAWN |
| G1086 | Not reported | n/r | 0 | Solar | STUDY |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.