Substation Scout

Garfield & Columbia, WA interconnection queue

1 active project totalling 250 MW in the BPA queue.

1active projects
250active MW
1total filed
Queue IDProjectkVMWResourceStatus
G0285 Lower Snake Phase 1 n/r 250 Wind ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.